Remodeling2026-09-11T11:39:00-07:00

Remodeling that respects your budget and your time

Kitchens, bathrooms, basements, and full-home remodels across Bellingham and Whatcom County. One general contractor from design through punch list.

A remodel is a stressful thing. We try to make it less so

Every remodel is different, but every remodel has the same problem: it takes over your home for weeks or months. Our job is to make that disruption as short, clean, and predictable as possible.

That means an accurate written scope before we start, a realistic timeline (not the optimistic one), daily cleanup, containment on interior projects, and weekly communication so you always know what’s happening tomorrow. Whether you’re doing a single bathroom or a whole-house renovation, the fundamentals are the same.

What's included

Kitchens

Full kitchen remodels — cabinets, counters, appliances, layout.

Bathrooms

Full bath remodels, walk-in showers, tub-to-shower conversions.

Basements & Additions

Finished basements and home additions of every size.

What we offer

How the project runs

01

Discovery

On-site walkthrough — what you want, what you don’t, budget context.

02

Scope & Design

Written scope, materials list, and preliminary drawings.

03

Build

Clean containment, daily updates, quality control at every stage.

04

Punch List

Final walkthrough, punch list, and warranty documentation.

Frequently Asked Questions

What does an addition cost?2026-09-09T13:30:56-07:00

Room additions in Whatcom County typically run $350 to $550 per square foot depending on complexity. ADUs and second-story additions vary more widely with structural scope.

Will the addition look like it belongs?2026-09-09T13:30:48-07:00

Yes. Matching siding, trim, and rooflines to the existing home is one of the hardest parts of an addition, and it’s a detail we prioritize.

Can you build an ADU on my property?2026-09-09T13:30:40-07:00

Depends on zoning and setbacks. Whatcom County and Bellingham both allow ADUs in most residential zones, but there are size and placement rules. First conversation includes a feasibility check.

Do you handle permits and engineering?2026-09-09T13:30:32-07:00

Yes. We coordinate structural engineering, produce permit-ready drawings, submit to Whatcom County or your city, and manage all inspections.

How long does a room addition take?2026-09-09T13:30:25-07:00

From signed contract to move-in, a typical room addition runs 4 to 7 months, depending on scope and permit turnaround. Second-story additions and ADUs run longer.

Can you add an ADU or rental in the basement?2026-09-09T13:30:17-07:00

Sometimes, depending on zoning and separate-entry requirements. Bellingham and Whatcom County both allow basement ADUs in most residential zones. We check feasibility as part of the first conversation.

Do I need egress windows?2026-09-09T13:29:57-07:00

Any basement bedroom requires a code-compliant egress window. Living rooms and family rooms usually don’t. We flag what’s required during design.

What about moisture and mold?2026-09-09T13:29:49-07:00

Moisture management is designed in from the start — vapor barriers, closed-cell foam against concrete, and proper drainage integration. Skipping those steps is how PNW basements go bad.

How long does a basement finish take?2026-09-09T13:29:41-07:00

Six to twelve weeks of active construction for a typical 1,000 sq ft basement, depending on scope and whether we’re doing a bathroom.

How much does a basement finish cost?2026-09-09T13:29:33-07:00

A typical Whatcom County basement finish runs $35k to $90k depending on square footage, whether a bathroom is included, and finish level. Egress windows add cost.

Can I convert my tub to a shower?2026-09-09T13:29:25-07:00

Yes, and it’s one of our most-requested remodels. Same footprint, different room entirely. Typically 3 to 4 weeks of active work.

What about walk-in showers?2026-09-09T13:29:17-07:00

We build them frequently — curbless entries, custom tile floors with proper slope to drain, and glass panels or full enclosures. Waterproofing is done with a full membrane system.

Do you handle plumbing and electrical?2026-09-09T13:29:09-07:00

We coordinate licensed subs for plumbing and electrical, and self-perform framing, waterproofing, tile, and finish. Everything gets permitted and inspected.

What does a bathroom remodel cost?2026-09-09T13:29:01-07:00

Full bathroom remodels in Whatcom County typically run $18k to $55k. Primary suite bathrooms with custom tile and glass can run higher.

How long does a bathroom remodel take?2026-09-09T13:28:53-07:00

Three to five weeks of active construction for a typical full renovation. Total elapsed time from contract to finish runs 8 to 12 weeks including materials lead.

Can you open the kitchen to the living room?2026-09-09T13:28:45-07:00

Often yes. Removing a wall between kitchen and living room requires structural evaluation — if it’s load-bearing we install a beam. We coordinate engineering as needed.

Do you handle appliances?2026-09-09T13:28:37-07:00

Yes — we source appliances directly, coordinate delivery timing with install, and handle all rough-in for gas, water, and electrical.

What’s a realistic budget?2026-09-09T13:28:29-07:00

A meaningful kitchen remodel in Whatcom County typically runs $45k to $120k. The range reflects cabinetry grade, appliance package, and whether the layout changes.

Can we cook during the remodel?2026-09-09T13:28:21-07:00

Not in the kitchen, but yes overall — we set up a temporary kitchen (fridge, microwave, sink alternative) in an adjacent space. Most families adapt fine.

How long does a kitchen remodel take?2026-09-09T13:28:14-07:00

Six to ten weeks of actual construction once cabinets arrive. Total elapsed time from signed contract to finished kitchen is typically 12 to 20 weeks.

Do you pull permits?2026-09-09T13:28:06-07:00

Yes. We pull permits with Whatcom County or the appropriate city, schedule inspections, and handle sign-off. Call 360-932-0505 to talk through your project.

How long from first call to project completion?2026-09-09T13:27:57-07:00

Typical bathroom, 8 to 12 weeks total. Kitchens, 12 to 20 weeks. Whole-home projects, 4 to 8 months. Timelines include design, materials lead, and build.

Do you provide design services?2026-09-09T13:27:49-07:00

For most remodels we work design-build: drawings, materials selection, and construction under one contract. For larger custom work we’re happy to coordinate with your architect.

What does a typical remodel cost in Whatcom County?2026-09-09T13:27:41-07:00

Bathrooms typically run $18k to $55k. Kitchens $45k to $120k. Basement finishes $35k to $90k. Additions and whole-house remodels vary widely with scope.

Can I stay in the house during a remodel?2026-09-09T13:27:28-07:00

Usually yes — most single-room remodels don’t require you to move out. Whole-home or full kitchen remodels sometimes do. We’ll be honest about livability during scoping.

Ready to start your project?

Free estimates for Whatcom County residential projects. No obligation, no pressure.