Bathroom Remodeling2026-09-11T11:38:58-07:00

Bathrooms that work every day and hold up for decades

Full bathroom remodels, walk-in showers, tub-to-shower conversions, and tile work across Bellingham and Whatcom County.

Bathrooms are engineering as much as design

A bathroom is a small space packed with plumbing, electrical, ventilation, waterproofing, and finish work — and it’s the room most likely to have hidden problems when you open the walls. Half the value we bring is knowing what to look for and how to solve it once we find it.

Every Whatcom County bathroom we build gets proper waterproofing behind the tile (not just greenboard), correctly sized ventilation, and finish work that holds up in the wettest room of the house.

What's included

Full Renovations

Tear-out to finish. New layouts, walk-in showers, custom vanities.

Walk-In Showers

Curbless entries, custom tile, glass panels, proper waterproofing.

Small Updates

Vanity, tile, lighting, and fixture refreshes without a full gut.

What we offer

How the project runs

01

Design

Layout, materials, waterproofing plan.

02

Demo

Tear-out with dust containment. Rot and mold inspection.

03

Build

Rough-in, waterproofing, tile, and finish. 3 to 5 weeks typical.

04

Reveal

Final walkthrough, warranty, ready to use.

Frequently Asked Questions

Can I convert my tub to a shower?2026-09-09T13:29:25-07:00

Yes, and it’s one of our most-requested remodels. Same footprint, different room entirely. Typically 3 to 4 weeks of active work.

What about walk-in showers?2026-09-09T13:29:17-07:00

We build them frequently — curbless entries, custom tile floors with proper slope to drain, and glass panels or full enclosures. Waterproofing is done with a full membrane system.

What does a bathroom remodel cost?2026-09-09T13:29:01-07:00

Full bathroom remodels in Whatcom County typically run $18k to $55k. Primary suite bathrooms with custom tile and glass can run higher.

How long does a bathroom remodel take?2026-09-09T13:28:53-07:00

Three to five weeks of active construction for a typical full renovation. Total elapsed time from contract to finish runs 8 to 12 weeks including materials lead.

Ready to start your project?

Free estimates for Whatcom County residential projects. No obligation, no pressure.